There is a succession of anecdotes, and there are specialized courses. Experts call them experts, and they must have their advantages. They are professionals in every particular field. The C-IBP-2502 test material, in order to enhance the scientific nature of the learning platform, specifically hired a large number of qualification exam experts, composed of product high IQ team, these experts by combining his many years teaching experience of C-IBP-2502 quiz guide and research achievements in the field of the test, to exam the popularization was very complicated content of SAP Certified Associate - SAP IBP for Supply Chain exam dumps, better meet the needs of users of various kinds of cultural level. Expert team not only provides the high quality for the C-IBP-2502 Quiz guide consulting, also help users solve problems at the same time, leak fill a vacancy, and finally to deepen the user's impression, to solve the problem of SAP test material and no longer make the same mistake.
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
Topic 4 |
|
Topic 5 |
|
Topic 6 |
|
Topic 7 |
|
Topic 8 |
|
Topic 9 |
|
>> C-IBP-2502 Latest Study Materials <<
The three formats of SAP C-IBP-2502 practice material that we have discussed above are created after receiving feedback from thousands of professionals around the world. You can instantly download the SAP C-IBP-2502 Real Questions of the TestPassed right after the payment. We also offer our clients free demo version to evaluate the of our SAP Certified Associate - SAP IBP for Supply Chain (C-IBP-2502) valid exam dumps before purchasing.
NEW QUESTION # 16
What are some of the actions configurators can do when working with versions? Note: There are 2 correct answers to this question.
Answer: A,B
Explanation:
Versions in SAP IBP (e.g., baseline, scenario) allow what-if planning, with configurators managing data across them, per SAP IBP's version management documentation.
* Option A: Delete key figure data for a date range for all versions at onceThis is incorrect. Purge jobs delete data per version, not across all versions simultaneously in one action.
* Option B: Copy key figure data from any version to any versionThis is correct. The Copy Operator can transfer key figure data between any versions (e.g., baseline to scenario), a standard feature, per SAP IBP's documentation.
* Option C: Copy master data from base version to other versionThis is correct. Master data can be copied from the base version to other versions via the Manage Versions app or data integration, per SAP IBP's version setup.
* Option D: Run an application job to purge obsolete versionsThis is incorrect. Versions are managed manually or via expiration, but there's no specific job to "purge obsolete versions"; data purging is separate.
Thus, B and C are valid actions, per SAP IBP's official version capabilities.
NEW QUESTION # 17
Which of the following are features of lag-based snapshots? Note: There are 2 correct answers to this question.
Answer: A,B
Explanation:
Lag-based snapshots in SAP IBP capture historical key figure values with a specified time offset (lag), useful for tracking past data (e.g., demand from 3 weeks ago). Their configuration and behavior are defined in SAP IBP's time-series planning framework.
* Option A: The number of lag-based snapshots are limited to nine levelsThis is incorrect. There's no documented limit of nine snapshots in SAP IBP; the number depends on configuration and performance, not a fixed cap.
* Option B: Lag-based snapshots are created in the Configuration app for a fixed time rangeThis is incorrect. Snapshots are configured in the Planning Areas app (via key figure settings), not a generic
"Configuration app," and they dynamically adjust based on lag, not afixed range.
* Option C: Target key figures for these snapshots are exposed to the user in planning viewThis is correct. Lag-based snapshot key figures (e.g., SNAPSHOT_LAG1) are visible and usable in planning views (e.g., Excel), allowing users to analyze historical data, per SAP IBP's documentation.
* Option D: Target key figures for these snapshots must have lag as a root attribute in the base planning levelThis is correct. The lag attribute (e.g., LAG = 1, 2) must be part of the base planning level (e.g., PERPRODLOCLAG) to store snapshot values distinctly, a requirement in SAP IBP's snapshot setup, per official guides.
Thus, C and D are features of lag-based snapshots, per SAP IBP's official functionality.
NEW QUESTION # 18
Model configuration allows the attributes of a master data type to be assigned as key figures. Which feature is relevant for this type of object?
Answer: B
Explanation:
In SAP IBP, the "Attribute as Key Figure" feature allows master data attributes (e.g., Product Category) to be used as key figures, configured in the Planning Areas app, per SAP IBP's documentation.
* Option A: This type of key figure is not usually stored and it cannot be editableThis is incorrect.
Attribute key figures are stored (sourced from master data) and can be editable if configured as such, not inherently non-editable.
* Option B: This type of key figure has better performance than a time-independent key figureThis is incorrect. Performance depends on usage, not a guaranteed advantage over other time-independent key figures.
* Option C: This object usually provides a single value for a unique planning combinationThis is correct. An attribute key figure (e.g., Product Price) provides one static value per planning combination (e.g., PERPROD), a defining feature, per SAP IBP's configuration guides.
* Option D: This object contains user-defined criteria that monitor the running of business plans This is incorrect. This describes alerts or KPIs, not attribute key figures.
Thus, C is the relevant feature, per SAP IBP's official definition.
NEW QUESTION # 19
Which processes are running in sample planning areas SAP6 and SAP3?(Choose three)
Answer: A,B,C
Explanation:
SAP IBP provides sample planning areas (e.g., SAPIBP1, SAP3, SAP6) with preconfigured processes to demonstrate functionality. The question seems incomplete ("running in sampl to this question"), but based on standard SAP naming and context, it likely asks about processes in SAP6 and SAP3.
* SAP6: Focused on Demand Planning and Sensing.
* SAP3: Focused on Inventory Optimization.
* Both may overlap with broader S&OP processes.
* Option A: Supply and Allocation PlanningThis is incorrect. Supply and Allocation Planning is typically in SAPIBP1 or SAP4 (response-focused), not SAP6 (demand-centric) or SAP3 (inventory- centric).
* Option B: Inventory OptimizationThis is correct. SAP3 is the sample planning area for Inventory Optimization, supporting multi-stage inventory planning with key figures like Target Inventory and Safety Stock, as per SAP's official sample content.
* Option C: Demand SensingThis is correct. SAP6 includes Demand Sensing, enhancing short-term forecasts using pattern recognition and real-time data (e.g., sales orders), a key feature of SAP IBP's demand module.
* Option D: Sales and Operations PlanningThis is correct. Both SAP6 and SAP3 support elements of S&OP. SAP6 covers demand planning (an S&OP component), while SAP3's inventory planning integrates with S&OP's supply-demand balancing, as seen in SAPIBP1's broader S&OP scope.
Thus, B, C, and D match the processes in SAP6 (Demand Sensing, S&OP) and SAP3 (Inventory Optimization, S&OP), per SAP's sample planning area documentation. (Note: The original answer B, D, E seems to misinterpret E as present; corrected to B, C, D based on SAP6/SAP3 focus.)
NEW QUESTION # 20
Which of the following data can be tracked using a change-history-enabled key figure? Note: There are 3 correct answers to this question.
Answer: B,C,E
Explanation:
Change-history-enabled key figures in SAP IBP track modifications to values, logging details for auditability, configured in the Planning Areas app. The tracked data is defined by SAP IBP's change history functionality, per official documentation.
* Option A: Scenario IDThis is incorrect. Scenario ID identifies the planning scenario, but it's not tracked in key figure change history; it's a context, not a change detail.
* Option B: Modified codeThis is correct. "Modified code" (likely intended as "modification code" or user ID) tracks who made the change, a standard field in SAP IBP's change log.
* Option C: AttributesThis is correct. Changed attribute values (e.g., Product ID, Location ID) tied to the key figure's planning level are tracked, per SAP IBP's documentation.
* Option D: Key figure typeThis is incorrect. Key figure type (e.g., stored, calculated) is a configuration setting, not a dynamic value tracked in change history.
* Option E: Reason codeThis is correct. Reason codes (e.g., manual adjustment justification) can be logged with changes, a feature in SAP IBP's Excel UI and change history, per official guides.
Thus, B, C, and E are tracked data elements, per SAP IBP's change history capabilities.
NEW QUESTION # 21
......
Normally, you will come across almost all of the C-IBP-2502 real questions on your usual practice. Maybe you are doubtful about our C-IBP-2502 guide dumps. We have statistics to tell you the truth. The passing rate of our products is the highest. Many candidates can also certify for our C-IBP-2502 Study Materials. As long as you are willing to trust our C-IBP-2502 preparation materials, you are bound to get the C-IBP-2502 certificate. Life needs new challenge. Try to do some meaningful things.
Vce C-IBP-2502 Files: https://www.testpassed.com/C-IBP-2502-still-valid-exam.html